Request a Quote
Describe your application; we get back within 48 hours with a preliminary quote, application analysis and cycle projection.

Prepare these for your quotation
- Make, model and clamping force of the injection moulding machine
- Part drawing, photo or a short video
- Number of cavities and target cycle time
- Label type: single side, wrap-around or bottom
Request for quotation
Leave unknown fields empty; you can attach a sample or drawing (PDF, STEP, DWG).
- Manufactured in İkitelli OSB
- Preliminary quote within 48 hours
- Free application analysis
The quotation process in four steps
- 01
Request
Fill in the form or send a sample.
- 02
Application analysis
Cycle, cavity and robot recommendation within 48 hours.
- 03
Test centre
If you wish, a trial with your own mould in İkitelli.
- 04
Technical quotation
Scope, options, lead time and FAT plan.
What a standard quotation includes
- Robot and control unitIncluded
Including HMI, recipe management and Euromap 67 interface
- EOAT, label magazine and static chargingIncluded
Built for your part
- Safety fence and door interlocksIncluded
With CE conformity
- Factory acceptance test (FAT)Included
At our test centre, with report and video
- Commissioning and 2-day operator and maintenance trainingIncluded
On site
- Outfeed conveyor and stackingIncluded
Belt with counter and stacking lane
- Vision inspection (VQ-Vision)Not included
Priced as an option
- Boxing and palletisingNot included
Priced per project
- Mould modificationsNot included
Planned with your mould maker if needed
When does the cell pay for itself?
Enter your own figures to see the annual savings and the payback period.
Between 1,000 and 50,000,000
Between 1 and 4
Between 0 and 10
Between 0 and 100,000
Between 0 and 2,000,000,000
Between 0 and 100
Between 0 and 50
Between 0 and 50
- Annual savings
- €144,000
- Labour savings
- €129,600
- Scrap savings
- €14,400
- Payback period
- 15 months
- 5-year net gain
- €540,000
Calculation: labour = shifts × operators × monthly cost × 12; scrap = annual output × cost per part × (current − target scrap). Payback = investment ÷ monthly savings.
Results are estimates and exclude energy, maintenance and financing costs. Request a quote for an exact calculation.
Get a quote for this scenario