25 September 2026· Lids and Cups· LM-8

Retrofit of a 2015 side-entry robot: downtime −35%

HMI, servo drives and magazine were renewed on a robot of another brand; downtime, at 6 hours per week because of unobtainable spare parts, fell to 3.9 hours.

  • 6.0 → 3.9hDowntime / week
  • 2.9 → 2.5sCycle
  • 0.6% → 0%Double-label scrap
Retrofit of a 2015 side-entry robot: downtime −35%

01Challenge

The controller of the lid producer's 2015 side-entry robot was discontinued; while parts were awaited for drive failures the line stood idle an average of 6 hours per week. The spring magazine picked double labels towards the end of the stack.

02Solution

Keeping the frame, a KEBA KeMotion controller with 15" HMI, KeDrive servo drives, an LM-8 magazine and ES-Charge charging were fitted; the safety circuit was renewed and a new CE declaration issued. The work was completed in the workshop in two weeks.

03Result

Weekly downtime fell to 3.9 hours (−35%), double-label scrap dropped to zero and the cycle shortened from 2.9 to 2.5 seconds. The retrofit cost 45% of a new robot.

Result metrics

  • 6.0→3.9hDowntime / week
  • 2.9→2.5sCycle
  • 0.6%→0%Double-label scrap

Before / After

Retrofit of a 2015 side-entry robot: downtime −35% — AfterBeforeAfter

Drag to compare

Free application analysis

Share your container, label and mould details; we will get back within 48 hours with a cycle and investment projection.