Skip to content
Plast Eurasia Istanbul 2026 · 2–5 December · TÜYAPTime left: 54 d 19 hGet an invitation
DS-Conveyor· DS/HA/TK Downstream automation· Downstream and Automation

DS-Conveyor Outfeed Conveyor

PU or modular-belt outfeed conveyor: food-grade, servo speed, synchronised with the robot.

Lead time: 3–5 weeks
  • 1.5–6mLength
  • ≤ 40m/minSpeed
DS-Conveyor Outfeed Conveyor

Overview

In food packaging, belt material and cleanability are decisive. The DS-Conveyor is built with an FDA-compliant PU belt or a modular plastic belt on a stainless frame; side guides adjust without tools.

The servo drive runs in sync with the robot's release moment: parts are spaced evenly, and the VQ-Vision camera and DS-Stack counter work at that pitch. 1.5–6 m length, straight or 90° turn modules.

Key Features

  • Food-grade beltFDA-compliant PU or modular belt; stainless frame.
  • Servo-synchronised speedEven part pitch tied to the robot release moment.
  • Modular length1.5–6 m; straight and 90° turn modules.

Gallery

DS-Conveyor Outfeed Conveyor 101 / 03

Technical Specifications

Axes
Axis driveServo drive
Maximum speed0.7m/s
Control and HMI
Line interfaceDigital I/O / EtherCAT
Power and pneumatics
Connected load0.75kW
Supply380 V / 50 Hz
Dimensions and weight
Dimensions (L×W×H)1,500–6,000 × 400–800 × 900mm
Weight90–260kg
ColourStainless / RAL 7035
Conformity and delivery
CE conformityYes
Lead time3–5weeks
Warranty24months

Options

  • De-ionising barOPT-ION

    Removes residual charge from parts.

    Optional
  • 90° turn moduleOPT-90

    Direction change in tight layouts.

    Optional
  • Full stainless frameOPT-SS

    For wet-cleaning areas.

    Optional

Standard Scope of Supply

  • Conveyor modules and side guides
    Included
  • Servo drive and cable set
    Included
  • Commissioning and operator training (1 day)
    Included
  • User manual and CE declaration
    Included
  • Length and layout design

    To suit the cell layout

    Included

Frequently asked questions

Yes. The conveyor comes with its own servo drive and links to the robot's release signal via digital I/O or EtherCAT.

3–5 weeks for the standard configuration. The lead time starts with order and sample approval; product-specific parts are included.

Frequently replaced parts such as belts, bearings, sensors and the drive motor are stocked at our İkitelli warehouse and shipped within 48 hours.

Request a quote for this model

Briefly describe your application; we will get back within 48 hours with a preliminary quote and application analysis.

  • Manufactured in İkitelli OSB
  • Preliminary quote within 48 hours
  • Free application analysis

Your product expert

Selin Arslan

Sales Manager

Product
Production
Contact