Skip to content
Plast Eurasia Istanbul 2026 · 2–5 December · TÜYAPTime left: 54 d 19 hGet an invitation
VQ-Vision· VQ Vision inspection· Quality Control

VQ-Vision Label Quality Inspection System

Dual-camera inspection: label presence, position, rotation, print, seam and code reading; automatic reject and statistics.

FeaturedLead time: 6–8 weeks
  • 2Cameras
  • ≤ 300pcs/minInspection rate
  • 20msDecision time
VQ-Vision Label Quality Inspection System

Overview

In in-mould labelling, a faulty part that goes unnoticed until packing gets the whole case rejected. VQ-Vision uses two cameras (top and side) to check label presence, ±0.3 mm position deviation, rotation, print defects and seam gap; it reads QR/DataMatrix codes for lot traceability.

Results are kept on the HMI as statistics per shift, mould and cavity; the cavity producing the most faults is visible at once. The reject station separates the part with an air jet and the counter is transferred to MES via OPC UA.

Key Features

  • Dual camera, 20 ms decisionTop and side camera; full inspection in cycles under 5 s.
  • ±0.3 mm position checkLabel shift and rotation measured per part.
  • Code reading and traceabilityQR/DataMatrix; lot and cavity records to MES.
  • Per-cavity statisticsThe most faulty cavity is visible at once; maintenance can be planned.
  • Air-jet reject stationThe faulty part is separated without stopping the line.

Gallery

VQ-Vision Label Quality Inspection System 101 / 03

Technical Specifications

Labelling
Label checkPresence, position ±0.3 mm, rotation, print, seam, code
Control and HMI
Control systemIndustrial PC, Cognex compatible
HMI15" touch
Line interfaceEtherCAT / OPC UA
Remote accessVPN
Recipe memory500pcs
Power and pneumatics
Connected load1.2kW
Supply230 V / 50 Hz
Air pressure6bar
Dimensions and weight
Dimensions (L×W×H)1,200×800×1,900mm
Weight180kg
Conformity and delivery
CE conformityYes
Lead time6–8weeks
Warranty24months

Options

  • Third camera (bottom)OPT-3CAM

    Bottom label and embossing check.

    Optional
  • OCR date/lot readingOPT-OCR

    Verification of printed date and lot text.

    Optional
  • MES/ERP integrationOPT-MES

    Production and fault data transfer via OPC UA.

    Standard

Standard Scope of Supply

  • Camera station and lighting

    Top and side camera

    Included
  • Industrial PC and 15" HMI
    Included
  • Commissioning and operator training (1 day)
    Included
  • User manual and CE declaration
    Included
  • Air-jet reject station
    Included

Frequently asked questions

Yes. The camera station runs on the conveyor independently of the robot and communicates with the line via EtherCAT or OPC UA.

6–8 weeks for the standard configuration. The lead time starts with order and sample approval; product-specific parts are included.

Frequently replaced parts such as the lighting unit, reject valve and camera cables are stocked at our İkitelli warehouse and shipped within 48 hours.

Request a quote for this model

Briefly describe your application; we will get back within 48 hours with a preliminary quote and application analysis.

  • Manufactured in İkitelli OSB
  • Preliminary quote within 48 hours
  • Free application analysis

Your product expert

Selin Arslan

Sales Manager

Product
Production
Contact