Commissioning and Training
3 days installation + 2 days operator and maintenance training; on site or at the İkitelli test centre, with your own mould and labels.

Before every robot ships, it goes through a factory acceptance test (FAT) at the İkitelli test centre with the customer's mould and labels; target cycle and scrap rate are documented. On site, mechanical installation, Euromap 67 connection and fine tuning are completed in three days, followed by two days of operator and maintenance training.
Training covers recipe management on the HMI, product changeover, daily checks and the fault-finding flow; participants receive a certificate. The commissioning report and site acceptance record (SAT) are part of the delivery.
Scope of service
- Factory acceptance test (FAT)8 hours of uninterrupted production at the test centre; cycle and scrap record.
- Mechanical installation and alignmentFrame, guarding, conveyor; alignment to the mould daylight.
- Electrical and Euromap 67 connectionCabinet, safety circuit, IMM signals.
- Fine tuning and site acceptance (SAT)Recipe, static charging, conveyor speed; 4 hours of production.
- Operator and maintenance trainingHMI, changeover, daily maintenance, fault flow; certificate.
- Handover documentsCommissioning report, site acceptance record (SAT) and training certificates.
Process
- 01
Site preparation checklist
We send you a checklist for floor space, compressed air, power, mould and labels.
- 02
FAT
Before shipment the robot runs in production at our test centre with your mould and labels.
- 03
Shipping and installation
Mechanical installation, Euromap 67 connection and fine tuning are completed on site in 3 days.
- 04
SAT and training
The site acceptance record is signed, followed by 2 days of operator and maintenance training.
Frequently asked questions
Contact our service team
Send the machine serial number and a short description of the issue; our service line responds within 1 hour.