Relocation and Moving
Dismantling, transport, installation at a new machine or plant and re-commissioning of the robot.

When the machine park changes or the plant moves, the robot must be adapted to the new injection machine: mould daylight, Euromap connection and conveyor layout are recalculated. The Bor4 team takes responsibility from dismantling to re-commissioning; axes are locked and the cabinet packed separately for damage-free transport.
In the new layout the safety circuit and CE conformity are re-verified; a Euromap converter and cable set for the new machine brand are included.
Scope of service
- Dismantling and packingAxis locks, cabinet separate, labelled cabling.
- Transport coordinationDimensions and insurance with the carrier.
- Adaptation to the new machineMould daylight, Euromap converter, conveyor.
- Re-commissioningSafety verification, SAT.
Process
- 01
New layout plan
A layout plan is drawn up from the dimensions of the new machine and floor area.
- 02
Dismantling
Axes are locked and the cabinet is packed separately; dismantling takes 1 day.
- 03
Installation and SAT
Installation at the new machine, safety verification and site acceptance take 2–3 days.